■ Project name: Inner Mongolia Shangdu No.2 Power Generation Co., Ltd. Phase III coal yard closed steel structure project;
■ Project location: Dundahaote Town, Zhenglan Banner, Xilin Gol League, Inner Mongolia Autonomous Region;
■ Structure type: prestressed pipe truss structure;
■ Project Description: The main steel structure is a prestressed pipe truss with three longitudinal axes, axis A\C is the axis of truss column foot, axis C is the axis of middle column, and the lower end is a fixed hinge support; The structure has a single arch and two spans, with a single arch span of 254m, a structural span of 186m+68m, a longitudinal span of 176m and a top elevation of 54.2 m; There are 12 main trusses and 95 secondary trusses; The specifications of the bars are between Φ 76x4 and Φ 500x25, and all of them are made of Q355C;. The main cable type of the string cable is D64, and the roof cables are D30 and D42. The cables are made of hot extruded polyethylene (double PE sheathing) high-strength steel cables.
■ Construction method: The hoisting method of "assembling parts+closing in the air+moving the jig frame" is adopted.
Years of industry experience accumulation, professional focus on steel structure engineering